I took a half day off to work on the flooring but that may not have been the best idea as the plumbers were finally putting in sinks and stuff. And then the tools I needed were not there so more running around. Once I did start I began missing Ivan. We worked well together with the tile and both had good ideas with how to install it. This will be a little tougher with more angles and things to work around. I got half of it cut with the big angle of the tub out of the way.
Also the fill for the septic field was spread out and looks great. The slope is much better on the south side of the house. Ester is probably eying where to put the swing set.
- Friendly neighbors
- Don’t show dad.
- Big enough for a 5 gallon pail!
- Kid’s bathroom
- Sinks in the master
- Ivan!! This is how we were supposed to do it!!
- How about that angle?